Page 1 of 1
Duck fixed and track bike reassembly
Posted: Sun Jan 24, 2016 3:39 pm
by pstamper
Nice weather luckily and taking the duck out since fuel pump issues repaired. Hope everyone is OK with the big snow storm. Have no idea what was done to repair bike because he said it was a secret. Something in the wiring harness. Frame and triple back back so starting to put the bike back together. Going to clean the shop up and make some room.
Re: Duck fixed and track bike reassembly
Posted: Sun Jan 24, 2016 5:30 pm
by tacky1
Ohhhh, The RZV is looking pretty
Are you running R1 triples..
Re: Duck fixed and track bike reassembly
Posted: Mon Jan 25, 2016 2:04 am
by pstamper
All of it is 2006 r6. Swing arm at powder coater. Painted upper triple and coat of clear going on Monday. Then can install the front end.
Re: Duck fixed and track bike reassembly
Posted: Thu Jan 28, 2016 9:47 pm
by pstamper
Swingarm back. $100 and he even smoothed the rough part on the top of the arm. Few issues on reassembly with front. The RZV frame has a steel bracket riveted to the steering head for the steering lock. It hit the ignition switch and hated to do it but I had to grind it down to clear. The steering stops need ground down also because there is hardly any steering. I looked at a couple new GSXRs and R6 bikes at the dealer today and they have more distance lock to lock. I am going to install the tank and see what clearance I have and go from there.
Re: Duck fixed and track bike reassembly
Posted: Sat Jan 30, 2016 8:51 pm
by pstamper